{"id":30,"date":"2026-09-16T22:39:19","date_gmt":"2026-09-16T22:39:19","guid":{"rendered":"https:\/\/plate-technik.com\/?post_type=project&#038;p=30"},"modified":"2026-09-18T13:54:06","modified_gmt":"2026-09-18T13:54:06","slug":"projekt-stamford-pioneer","status":"publish","type":"project","link":"https:\/\/plate-technik.com\/en\/projekte\/projekt-stamford-pioneer\/","title":{"rendered":"Stamford Pioneer Project"},"content":{"rendered":"<h3 class=\"wp-block-heading\">Redevelopment and commissioning of the IT infrastructure in the port of Bremen<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">As part of the project <strong>Stamford Pioneer<\/strong> supported PLATE Marine &amp; Technical Service with the technical overhaul and commissioning of the <strong>IT systems on board<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The work was carried out in <strong>Port of Bremen<\/strong> carried out and included the review and optimisation of the existing IT infrastructure. During this process, among other things, the <strong>Wi-Fi access points put into operation<\/strong> and set up for reliable wireless network coverage on board.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Another focus was the <strong>Repair and restoration of the central workstation PC in the engine room<\/strong>, in order to ensure the technical working capability required there.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In addition <strong>Safety training carried out for the crew<\/strong>, to support safe and responsible handling of the technical systems and IT infrastructure on board.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The project thereby combined <strong>IT service, network technology, technical troubleshooting and practical support for the crew directly on board<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Location:<\/strong> Port of Bremen<br><strong>Areas:<\/strong> IT infrastructure \u00b7 Wi-Fi \u00b7 Access points \u00b7 PC repair \u00b7 Technical support \u00b7 Security training<\/p>","protected":false},"excerpt":{"rendered":"<p>\u00dcberarbeitung und Inbetriebnahme der IT-Infrastruktur im Hafen Bremen Im Rahmen des Projekts Stamford Pioneer unterst\u00fctzte PLATE Marine &amp; Technical Service bei der technischen \u00dcberarbeitung und Inbetriebnahme der IT-Systeme an Bord. Die Arbeiten wurden im Hafen Bremen durchgef\u00fchrt und umfassten die \u00dcberpr\u00fcfung und Optimierung der vorhandenen IT-Infrastruktur. Dabei wurden unter anderem die Wi-Fi-Access-Points in Betrieb genommen [&hellip;]<\/p>\n","protected":false},"featured_media":31,"template":"","project_service":[8],"class_list":["post-30","project","type-project","status-publish","has-post-thumbnail","hentry","project_service-it"],"_links":{"self":[{"href":"https:\/\/plate-technik.com\/en\/wp-json\/wp\/v2\/project\/30","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/plate-technik.com\/en\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/plate-technik.com\/en\/wp-json\/wp\/v2\/types\/project"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/plate-technik.com\/en\/wp-json\/wp\/v2\/media\/31"}],"wp:attachment":[{"href":"https:\/\/plate-technik.com\/en\/wp-json\/wp\/v2\/media?parent=30"}],"wp:term":[{"taxonomy":"project_service","embeddable":true,"href":"https:\/\/plate-technik.com\/en\/wp-json\/wp\/v2\/project_service?post=30"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}